1. Which of the following
functions of the production planning and controlling is related to the time
table of activities
A.
Routing
B.
Expediting
C.
Scheduling
D. Dispatching
2. Which of the below is
not a popular production system?
A.
Continuous production
B.
Job order production
C.
Batch production
D. Project production
3. Which of the following
is not the function of Production, Planning & Control(PPC)?
A.
Routing
B.
Integration of processes
C.
Scheduling
D. Expediting and follow-up
4. Which of the following
is not a part of Five M’s?
A.
Material
B.
Machine
C.
Motion
D. Method
5. Procurement cycle time
is time consumed for
A.
Receiving of raw material
B.
Inspection of various raw materials
C.
Inspection of purchased components parts
D. All of the above
6. The correct sequence
of operations in production planning and control is
A.
Routing-Scheduling-Dispatching-Follow up
B.
Scheduling-Routing- Dispatching-Follow up
C.
Dispatching-Routing-Scheduling- Follow up
D. Routing-Scheduling-Follow up-Dispatching.
7. Which of the following
organisation is preferred in automobile industry?
A.
Functional organization
B.
Line organization
C.
Staff organization
D. Line and staff organizations
8. The transit time
consist of
A. Time taken by raw material from
machine to machine
B. Time consumed in moving the
work between various departments
C. Time taken by a worker to
machine a component
D. None of the above
9. Gantt chart is mostly
used for
A. Routing
B. Scheduling
C. Follow up
D. Inspection and quality control
10.
Critical path method
A. Helps in ascertaining time
schedules
B. Makes better and detailed
planning possible
C. Provides a standard method for
communicating project plans schedules and to time and cost performance
D. All of the above
Answers-
1-C, 2-D, 3-B, 4-C, 5-D, 6-A, 7-D, 8-B, 9-B, 10-A