Friday 25 June 2021

Maintenance Management MCQ Multiple Choice Questions with Answers




1.   Total productive maintenance aims at

        A.   Less idle time

        B.   Increase in productivity

        C.   Zero down time

        D.  None of the above



2.   Maintenance consist of the following action(s)

A.   Replace of component

B.   Repair of component

C.   Service of component

D.  All of the above



3.   (Down time in hours / Available hours) =

A.   Maintenance effectiveness

B.   Frequency of breakdown

C.   Effectiveness of maintenance planning

D.  None of the above


    4.   The down time cost consists of

A.   Loss of production

B.   Wages paid to the workers

C.   Reduction in sales

D.  All of the above



5.   A systematic approach for maintenance is

A.   Problem – Cause – Diagnosis – Rectification

B.   Problem– Diagnosis – Cause – Rectification

C.   Problem – Measure – Diagnosis – Rectification

D.  Problem– Diagnosis – Measure – Rectification



6.   The following is not a classification of maintenance

A.   Corrective maintenance

B.   Timely maintenance

C.   Scheduled maintenance

D.  Preventive maintenance



7.   The ____ goes on increasing with the increase in degree of maintenance efforts.

A.   Cost of down time

B.   Cost of spares and maintenance

C.   Labor and Overhead Cost

D.  All of the above



8.   The following is not a classification of maintenance

A.   Timely maintenance

B.   Corrective maintenance

C.   Scheduled maintenance

D.  Preventive maintenance



9.   With the increase in preventive maintenance cost, breakdown maintenance cost

A.   Increases

B.   Decreases

C.   Remain same

D.  Any of the above

 

         

Answers-

1-C,2-D,3-A,4-D,5-A,6-B,7-C,8-A,9-B.                    

 

                                 


 




1 comment: