Showing posts with label study material. Show all posts
Showing posts with label study material. Show all posts

Thursday, 28 July 2022

Material Management | Multiple Choice Questions | MCQs

  

              

1.  Materials management is also called____________
A. Distribution planning
B. Control and logistics management
C. Both of the above
D. Neither of the above


2.  Raw Materials and WIP can be classified under ________  
A.  Indirect Material 
B.  Direct Material 
C.  Finished Material
D.  Standard Parts


3.  Buying according to the requirements is called ________
A.  Seasonal Buying
B.  Hand to mouth buying
C.  Scheduled Buying
D.  Tender Buying


4.  _________ also called part lists or building lists is the document generated at the design stage.
A.  BOM (Bill of Materials)
B.  MRP (Material Requirement Planning)
C.  MPS (Master Production Schedule)
D.  All of the above


5.  The first activity of Purchasing cycle is _____________
A.  Communicating requirement to the purchase
B.  Source Selection and development
C.  Recognizing the need for procurement
D.  Inspection of goods


6.  ____ is the time that elapses between issuing replenishment order and receiving the material in stores.
A.  Replenishment time
B.  Lead time
C.  Idle-time
D.  None of the above


7.  ____ is the scientific technique for planning the ordering and usage of materials at various levels of production and for monitoring the stocks during these transactions.
A.  MRP
B.  MPS
C.  BOM
D.  None of the above


8.  Materials management is a coordinating function responsible for planning and controlling materials flow. Its objective(s) is/are:
A.  Maximize the use of the firm's resources
B.  Provide the required level of customer service
C.  Both of the above
D.  Neither of the above


9.  Procurement costs consist of ______________________________.  
A.  Cost of receiving quotations
B.  Cost of processing quotation and issuing purchase order
C.  Cost of following up and expediting purchase order
D.  All of these


10.  The modern technique of material management is _______________.
A.  ISO
B.  MRPe
C.  TQM
D.  MEOQ

Tuesday, 8 March 2022

MCQs on Purchase Management



1.  Whenever a department needs an item, it is officially brought to the notice of the purchasing department by filing a purchase requisition from. The next step is 
A. Exact quantity of material to be purchased and its specification is decided 
B. Prepare a list of suppliers who deal with the business of the articles to be purchasing and are reliable
C. Pen the quotations at prescribed time on the prescribed date
D. Prepare a comparative statement of the, terms and conditions mentioned in the quotation and then           analyze them.




2.  The important functions of purchase departments are __________________________. 
A. preparation of purchasing budget 
B. track pending purchase order 
C. issue and follow up purchase order  
D. all of these





3.  Which of the following is/are the assumptions of Economic order quantity (EOQ)?
A.  There are no bulk purchase discounts for making orders in large sizes. All units purchased for each         item of material cost the same unit price.
B.  The order lead time (the time between placing an order and receiving delivery from the supplier) is        constant and known.
C.  Annual demand and consumption for the inventory item is constant throughout the year.
D.  All of the above




4.  The order quantity or purchase quantity that minimize the total annual cost of ordering the item plus holding it in store is called the economic order quantity or EOQ.
A. True
B. False





5.  The EOQ can be calculated using a:
A. Table
B. Graph
C. Formula
D.    All of the above



6.  Supply lead time. This is the period of time between placing a new order with a supplier and receiving the delivery of the purchased items. The length of this supply lead time might be uncertain and might be several days, weeks or even months.

A. The above is statement is correct
B. The above statement is incorrect



7. Reorder level is the level of inventory at which a new order for the item should be placed with the supplier.
A. True
B. False




8.  There are four methods of government procurement. Which is not one of these methods?
A. Assistance
B. Sealed bidding
C. Competitive proposals
D. Acquisition




9.  Which is not a consideration in a make or buy decision?
A. Cost factors
B. Sales volume
C. Existence of sufficient administrative / technical personnel
D. Political and social factors with the organization




10.  The Bid Evaluation process is characterized by all of the following activities except?
A. Evaluation of suppliers financial resources
B. Ability to comply with technical specifications
C. Delivery schedule and cost factors
D. Competitors method of sourcing




11.  __________ is a written order directing the contractor to make changes according to the provisions of the contract documents.
A. Change order / purchase order amendment
B. Contract order modifications
C. Contractor claim
D. Owner directive


Sunday, 22 August 2021

Ergonomics Multiple Choice Question on Ergonomics with Answers | MCQs

 

 


1. The basic definition of Ergonomics is?

 

A.   Using relaxed posture

B.   Fitting the workstation to the employee

C.   Fitting the employee to the workstation

D.   Either B or C

 

2. ‘Ergonomics’ is related to human

 

A.   Comfort

B.   Safety

C.   Both ‘a’ and ‘b’

D.   None of the above

 

3. Ergonomics principle suggests that

 

A.   Monitoring displays should be placed outside peripheral limitations

B.   Glow-in-the dark dials made of reflective substances are good for viewing in the nights

C.   Visual systems should be preferred over auditory systems in noisy locations

D.   All of the above

 

4. The following subjects are related to ‘Ergonomics’

 

A.   Anthropology

B.   Physiology

C.   Psychology

D.   All of the above

 

5. Ergonomics is a body of knowledge concerned with:

 

A.   Human abilities

B.   Design of tools, machines, systems, tasks, jobs, and environments

C.   Fitting the job or task to the person

D.   All of the above

 

6. Examples of administrative controls include all except:

 

A.   Rest breaks

B.   Rotating workers through different jobs

C.   Installation of an adjustable height keyboard tray

D.   An effective tool maintenance program

 

7. Engineering controls involve:

 

A.   Workplace policy, procedures, and practices that minimize the exposure of workers to risk conditions

B.   A change in the physical features of the workplace

C.   Application of proper personal protective equipment

D.   Medical management

 

8. Which of the following could be considered an engineering control for an office ergonomics hazard:

 

A.   Switching to a chair with greater adjustability

B.   Implementing a stretching program

C.   Implementing a pre-work screening process

D.   Purchasing wrist braces

 

9. Four commonly recognized computer workstation postures are:

 

A.   Sitting, standing on both feet, standing with one foot resting, reclined

B.   Standing, sitting tilted forward, sitting upright, sitting tilted back

C.   Standing forward, laying down, sitting up, sitting on knees

D.   Sitting with arms supported, standing with no arm support, seated with foot support, seated with no foot support


 Answer-

 1-B, 2-C, 3-C, 4-D, 5-D, 6-C, 7-B, 8-A, 9-B.

Wednesday, 9 June 2021

MCQs on Material Handling

 


1. Raw Materials and WIP can be classified under ________

A. Direct Material

B. Indirect Material

C. Finished Material

D. Standard Parts


2. Material handling consists of movement of material from

A.   One machine to another

B.   One shop to another shop

C.   Stores to shop

D.   All of the above

3. The following is used to transport materials having flat bottoms

A.   Belt conveyor

B.   Roller conveyor

C.   Chain conveyor

D.   None of the above

4. _________ are the basic materials which have not undergone any conversion since their receipt from suppliers.

A.   WIP

B.   Raw Material

C.   Finished Parts

D.   Work Made Parts


5. Economy in material handling can be achieved by

A.   Employing gravity feed movements

B.   Minimizing distance of travel

C.   By carrying material to destination without using manual labour

D.   All of the above


6. The business cycle, price trends, National Economy is ___________

A.   Micro Factors

B.   Macro Factors

C.   Controllable Factors

D.   None of the above


7. Fork lift truck is used for

A.   Lifting and lowering

B.   Vertical transportation

C.   Both ‘a’ and ‘b’

D.   None of the above


8. _______also called part lists or building lists is the document generated at the design stage.

A.   MRP (Material Requirement Planning)

B.   BOM (Bill of Materials)

C.   MPS (Master Production Schedule)

D.   None of the above


9. Special purpose material handling equipment are used in

A.   Process layout

B.   Line layout

C.   Both ‘a’ and ‘b’

D.   None of the above


10.  Which of the following condition of rail surface will offer the least resistance?

A.   Very wet

B.   Very dry

C.   Average dampness

D.   Grease


Answers-

1-A,2-D,3-B,4-B,5-D,6-B,7-C,8-B,9-B,10-D


Thursday, 27 May 2021

MCQ On Production Planning and Control

 

1.   Which of the following functions of the production planning and controlling is related to the time table of activities

A.   Routing

B.   Expediting

C.   Scheduling

D.  Dispatching

 

2.     Which of the below is not a popular production system?

A.   Continuous production

B.   Job order production

C.   Batch production

D.  Project production

 

3.     Which of the following is not the function of Production, Planning & Control(PPC)?

A.   Routing

B.   Integration of processes

C.   Scheduling

D.  Expediting and follow-up

 

4.     Which of the following is not a part of Five M’s?

A.   Material

B.   Machine

C.   Motion

D.  Method

 

5.     Procurement cycle time is time consumed for

A.   Receiving of raw material

B.   Inspection of various raw materials

C.   Inspection of purchased components parts

D.  All of the above

 

6.     The correct sequence of operations in production planning and control is

A.   Routing-Scheduling-Dispatching-Follow up

B.   Scheduling-Routing- Dispatching-Follow up

C.   Dispatching-Routing-Scheduling- Follow up

D.  Routing-Scheduling-Follow up-Dispatching.

 

7.     Which of the following organisation is preferred in automobile industry?

A.   Functional organization

B.   Line organization

C.   Staff organization

D.  Line and staff organizations

 

8.     The transit time consist of

A.   Time taken by raw material from machine to machine

B.   Time consumed in moving the work between various departments

C.   Time taken by a worker to machine a component

D.  None of the above

 

9.     Gantt chart is mostly used for

A.   Routing

B.   Scheduling

C.   Follow up

D.  Inspection and quality control

 

10. Critical path method

A.   Helps in ascertaining time schedules

B.   Makes better and detailed planning possible

C.   Provides a standard method for communicating project plans schedules and to time and cost performance

D.  All of the above


Answers-

1-C, 2-D, 3-B, 4-C, 5-D, 6-A, 7-D, 8-B, 9-B, 10-A