1. Total productive maintenance aims at
A. Less idle time
B. Increase in productivity
C. Zero down time
D. None of the above
2. Maintenance
consist of the following action(s)
A. Replace of component
B. Repair of component
C. Service of component
D. All of the above
3. (Down time in hours / Available
hours) =
A. Maintenance effectiveness
B. Frequency of breakdown
C. Effectiveness of maintenance
planning
D. None of the above
4. The down time cost consists of
A. Loss of production
B. Wages paid to the workers
C. Reduction in sales
D. All of the above
5. A systematic approach for
maintenance is
A. Problem – Cause – Diagnosis –
Rectification
B. Problem– Diagnosis – Cause –
Rectification
C. Problem – Measure – Diagnosis –
Rectification
D. Problem– Diagnosis – Measure –
Rectification
6. The following is not a classification
of maintenance
A. Corrective maintenance
B. Timely maintenance
C. Scheduled maintenance
D. Preventive maintenance
7. The ____ goes on increasing
with the increase in degree of maintenance efforts.
A. Cost of down time
B. Cost of spares and maintenance
C. Labor and Overhead Cost
D. All of the above
8. The following is not a
classification of maintenance
A. Timely maintenance
B. Corrective maintenance
C. Scheduled maintenance
D. Preventive maintenance
9. With the increase in preventive
maintenance cost, breakdown maintenance cost
A. Increases
B. Decreases
C. Remain same
D. Any of the above
Answers-
1-C,2-D,3-A,4-D,5-A,6-B,7-C,8-A,9-B.